Projects Updated 3/31/25
-
Install 220V electricity to elevator site (on hold pending lift placement)
-
Clean out gutter drain on north side of WC
-
Install ceiling tiles in Resource Room mechanical closet
-
Replace exterior bulb Ed Bldg north side
-
Replace discolored ceiling tiles in the south of mezzanine hallway
-
East hallway drywall near atrium windows - finish and paint
-
Install LED strips in outdoor sign (some fabrication needed)
-
Install 3rd speaker under balcony
-
Ed bldg foyer, 2nd floor - repair floor
-
Install LED Panels (see worksheet)
-
Remove & replace parking lot light in rear
-
Paint facia on east and north sides of Worship Center (includes lift rental)
-
Install gutters on east and north sides of Worship Center (this is a guess)
-
Pressure wash Worship Center brick (near roof)
-
Install bell tower speakers
-
Replace bulbs on Worship Center porch
-
Replace ceiling tiles in men's restroom 1st floor
-
Install Mini Split HVAC system in pastor's office
-
Replace cloudy windows in Worship Center (2)
-
Replace ceiling tiles in Janitor's closet 1st floor
-
Repair drywall in1st floor ed bldg foyer
-
Remodel small bathrooms on 1st floor
-
Replace partitions in 1st floor restrooms
-
Wire 2nd floor light to office switch
-
Wire 1st floor emergency light to constant power
-
Paint roof access ladder black
-
Rework grade on back lot to accommodate drainage
-
Repair drywall on south wall of 1st floor hallway
-
Install new water coolers on 1st and 2nd floor
-
Install window shade in room 104
-
Install window shades in WC (4 in back hallway and organ chamber)
-
Rekey boiler room and bell tower locks to new keys
-
Repair drain valve in baptistery
-
Install larger float on cooling tower float valve
-
Repair wooden doors on front of Worship Center
-
Replace closer on north door of interior Worship Center
-
Install rubber feet on furniture in sitting areas
-
Install blank on telephone jack (1st floor children's area) & paint
-
Combine lights to one switch in 2nd floor rooms